With almost 50 years of experience as a supplier to the shipbuilding and oil & gas industries, it was a logical step for Holmatro to deliver a complete TP levelling set to one of the first offshore wind parks in the world: Belwind. Since then our list of references in offshore wind has increased enormously. Holmatro’s Offshore Wind Hydraulic Solutions are ideally suited to ensure that the foundations of wind turbines are levelled and fixated. Next to levelling and fixation we offer also seafastening solutions.
The cylinders that are used within the Offshore Wind Hydraulic Solutions are made out of aluminium or steel. They are always fitted with special seals and a corrosion-resistant coating on the cylinder housing, the plunger and the couplers. Next to TP levelling, Holmatro also offers solutions for seafastening systems and jacket pile stoppers.
Challenge us! Allow us to inspire you and challenge us to come up with a solution for your specific problem.
Contact us by email or call +31 (0) 162 751 500.
Details | ||
Articlenumber | Offshore Wind Hydraulic Solutions | |
Basic specifications | ||
max. working pressure | 720 / 72 (bar/Mpa) | 10443 psi |
Performance | ||
tonnage | 50 t | 110231 lb |
stroke | 150 mm | 5.9 in |
capacity | 490.3 kN / 50 t / 490.3 / 50 (kN/t) | 110224 lbf |
dump tank | 25000 cc | 845.4 oz |
General specifications | ||
acting type | single or double | |
cylinder | aluminium or steel | |
valve block (FlowPanel™) | 6-way |